Track Records For Prefeed,Feed Study&Project Management

Scope
Project Name
Scope of Work
Client
Year Completed
FEED & DETAIL ENGINEERING Call Out Project Management and Engineering Services Project Management, Engineering Services and Construction Supervision
1. Detail Engineering Services for Installation Gas Compressor at Grati OPF BR-08
2. Detail Engineering Services for Installation Oyong Gas Lift Compressor BR-09
Santos Northwest Natuna B. V. 2014
PROJECT MANAGEMENT Project Management Consultant (PMC) For Pengawasan Pekerjaan
Di PT. Pertamina EP – Region KTI (Kawasan Timur Indonesia (Field Bunyu, Sangata & Papua))
PMC For Supervision of Facility Production Work (Tank Farm, Compressor, Pump, Separator, Flow Line & Gas Line PT. Pertamina EP – Region KTI 2012
PROJECT MANAGEMENT Project Management Consultant (PMC) For Proyek Arun LNG Receiving HUB dan Regasification Terminal Project Management Services Preparation & Review of Bid Document Technical Assistance During Phase Tender Project Management & Supervision, Commissioning & Start – Up PT. Pertamina (Persero) 2012
FEED & DETAIL ENGINEERING Blanket Engineering Services For Various Development Activities Blanket Engineering(*)
– Feed Design Oyong Floating
Production Unit
– OPF Grati Modification Basic Design
Santos (Sampang) Pty. Ltd. 2011
FEED Engineering Support Services – Anoa Phase 4 Cost Risking Analysis Reviewing cost estimation and WBS preparation by FEED Contractor. And to provide an independent assessment to the validity of the cost data, the task durations, any assumption made, the accuracy and/or reasonableness of the data used and the overall accuracy of the cost estimation
Review/redesign for deck extension of Anoa phase 4 platform for construction philosophy
Premier Oil Natuna Sea B. V. 2010
FEED,DETAIL ENGINEERING&PROJECT MANAGEMENT Provision of General Project Engineering Services Blanket Engineering
Study and Detail Engineering Offshore Platform Facilities, Modification of KF/KG/KRA/KH Platforms
Star Energy (Kakap) Ltd. 2009
FEED South Sumatra NGL Project
(FEED and EPC Tender Preparation)
Project Management Services Basic Engineering, technology selection, plant design capacity selection, and process simulation for cryogenic extraction facilities in Prabumulih Barat, fractionation plant at Sungai Gerong and NGL Pipeline from P. Barat to S. Gerong. This scope including EPCI execution phase tender documents preparation, technical assistance during bidding. PT. E1 – Pertagas 2008
PREFEED Well Design Studies For Ande Ande Lumut Field The scope of work consist review ESP design and suitable deployment methods, make recommendation on all material, develop strategy for well oprability and potensial intervention, flow assurance review, conduct tubing stress analysis, reservoir competency/sand control, completion design, and cost benfit analysis. Genting Oil Natuna Pte. Ltd. 2008
FEED PRE-FEED Studies For Ande Ande Lumut Study new Wellhead Platform for Ande-ande lumut. Scope includes : Facilities description write up, cost estimates and schedule, operations philosophy, facilities abandonment, HSE philosophy, WHP review, material selection study, floating production screening, power generation study, heating study, utility study, structural study, design basis, and preliminary flow assurance for the export pipeline. Genting Oil Natuna Pte. Ltd. 2008
FEED FEEDStudy – Relocation of Tuban Marine Terminal Detail engineering for marine system including: Submarine pipeline, PLEM, Flexi riser, SPM, FSO and tanker mooring study PCI – Pertamina 2005
FEED & DETAIL ENGINEERING Refurbishment of FPSO Seagood 1 FEED & Detail Engineering of the FPSO enhancement including: Jambonizing (extend FPSO by 20m), structural and naval archtecture studies, all facility engineering (including all facility on Phase 2 such as pipeline gas compressor) and construction support and supervision Labroy Shipbuilding 2005